What are your targeted throughput rates to be considered production ready?
Are you identifying different throughput rates for different feedstocks?
What points of failure for P3 were identified as the throughput testing was ramped up?
Were any points of failure identified below desired throughput rates and, if so, can the causes of those points of failure be remedied?
When do you expect to resolve any remaining issues that are preventing reliable up times at desired throughput rates?