Posted On: 09/15/2013 11:24:35 PM
Post# of 1536
Re: sevenOdouble #1328
could they be talking about mbs? can you mix it with Portland cement? why do that?
Deeper contaminated soil and ground water will be treated using a technology that locks the mercury in a mixture of Portland cement and another agent, preventing it from moving into the surrounding soil and ground water. The EPA expects all cleanup work will be completed by fall 2014. The current owner, 26 Railroad Ave, Inc., will be responsible for land use restrictions at the site to ensure that the treated soil and ground water are not disturbed and that no drinking water wells are installed.
Deeper contaminated soil and ground water will be treated using a technology that locks the mercury in a mixture of Portland cement and another agent, preventing it from moving into the surrounding soil and ground water. The EPA expects all cleanup work will be completed by fall 2014. The current owner, 26 Railroad Ave, Inc., will be responsible for land use restrictions at the site to ensure that the treated soil and ground water are not disturbed and that no drinking water wells are installed.
(0)
(0)
Scroll down for more posts ▼