Posted On: 06/26/2013 10:51:38 PM
Post# of 39368
![](/m/assets/46931549/no_avatar_available_thumb.jpg)
My SJ#3 estimate is 1 barrel every 3 months with the majority of that coming from oil changes to the drilling rig and associated equipment.
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)
My SJ#3 estimate is 1 barrel every 3 months with the majority of that coming from oil changes to the drilling rig and associated equipment.