Posted On: 05/01/2013 9:12:48 AM
Post# of 39368
So you are saying "we are" running an open hole log before we set casing and then running an electric log? Your post below implies that we are running casing first. Am I reading it wrong?
I have a date this AM with a wire line truck.
We're running slow with casing so it looks like 6 AM instead of 3.....
(0)
(0)
Scroll down for more posts ▼