(Total Views: 93)
Posted On: 07/22/2025 9:02:40 AM
Post# of 13969

Australia> Getting solar panels certified by the Clean Energy Council (CEC) in Australia to sell them can be rigorous and time-consuming. It involves demonstrating compliance with Australian and/or international standards and undergoing a thorough review process.
Here's a breakdown of the process and why it can be challenging:
CEC Product Listing:
Solar panels need to be listed by the CEC to be eligible for use in grid-connected systems and to enable Small-scale Technology Certificates (STCs).
Compliance with Standards:
This includes meeting requirements like IEC 61730 Series for PV module safety and potentially other standards depending on the specific product features.
Testing and Certification:
Module testing must be performed by a CEC-approved laboratory and certified by a national certifying body.
Application Process:
The CEC assesses each model against a set of certification documents, and manufacturers need to provide accurate and complete applications, responding to clarifications promptly.
Potential Delays:
The CEC's application processing time can vary, with engineering technical assessments taking several weeks, and full accreditation potentially taking a further 2-6 months.
Ongoing Compliance:
Periodic factory inspections are required to ensure ongoing compliance with international standards.
Enhanced Listings:
If modules meet higher quality standards or are certified for specific environments, they may be eligible for enhanced listings.
Breaches of Terms and Conditions:
Misrepresenting PV modules or manufacturing them outside the scope of certification can lead to enforcement action, including suspension or de-listing of products.
Accredited Installers and Designers:
For STCs to be claimed on a solar PV system, it must be designed and installed by CEC-accredited installers and designers.
Icymi
Here's a breakdown of the process and why it can be challenging:
CEC Product Listing:
Solar panels need to be listed by the CEC to be eligible for use in grid-connected systems and to enable Small-scale Technology Certificates (STCs).
Compliance with Standards:
This includes meeting requirements like IEC 61730 Series for PV module safety and potentially other standards depending on the specific product features.
Testing and Certification:
Module testing must be performed by a CEC-approved laboratory and certified by a national certifying body.
Application Process:
The CEC assesses each model against a set of certification documents, and manufacturers need to provide accurate and complete applications, responding to clarifications promptly.
Potential Delays:
The CEC's application processing time can vary, with engineering technical assessments taking several weeks, and full accreditation potentially taking a further 2-6 months.
Ongoing Compliance:
Periodic factory inspections are required to ensure ongoing compliance with international standards.
Enhanced Listings:
If modules meet higher quality standards or are certified for specific environments, they may be eligible for enhanced listings.
Breaches of Terms and Conditions:
Misrepresenting PV modules or manufacturing them outside the scope of certification can lead to enforcement action, including suspension or de-listing of products.
Accredited Installers and Designers:
For STCs to be claimed on a solar PV system, it must be designed and installed by CEC-accredited installers and designers.
Icymi


Everything i post are my opinions only. DYODD