The EA is the document SIRG is waiting for approval on. It gets attached to the MPO.
Environmental Assessments (EA). How long and detailed must an environmental assessment (EA) be?
A. The environmental assessment is a concise public document which has three defined functions. (1) It briefly provides sufficient evidence and analysis for determining whether to prepare an EIS; (2) it aids an agency's compliance with NEPA when no EIS is necessary, i.e., it helps to identify better alternatives and mitigation measures; and (3) it facilitates preparation of an EIS when one is necessary. Section 1508.9(a).
Since the EA is a concise document, it should not contain long descriptions or detailed data which the agency may have gathered. Rather, it should contain a brief discussion of the need for the proposal, alternatives to the proposal, the environmental impacts of the proposed action and alternatives, and a list of agencies and persons consulted. Section 1508.9(b).
While the regulations do not contain page limits for EA's, the Council has generally advised agencies to keep the length of EAs to not more than approximately 10-15 pages. Some agencies expressly provide page guidelines (e.g., 10-15 pages in the case of the Army Corps). To avoid undue length, the EA may incorporate by reference background data to support its concise discussion of the proposal and relevant issues.
36b. Under what circumstances is a lengthy EA appropriate?
A. Agencies should avoid preparing lengthy EAs except in unusual cases, where a proposal is so complex that a concise document cannot meet the goals of Section 1508.9 and where it is extremely difficult to determine whether the proposal could have significant environmental effects. In most cases, however, a lengthy EA indicates that an EIS is needed.
37a. Findings of No Significant Impact (FONSI). What is the level of detail of information that must be included in a finding of no significant impact (FONSI)?
A. The FONSI is a document in which the agency briefly explains the reasons why an action will not have a significant effect on the human environment and, therefore, why an EIS will not be prepared. Section 1508.13. The finding itself need not be detailed, but must succinctly state the reasons for deciding that the action will have no significant environmental effects, and, if relevant, must show which factors were weighted most heavily in the determination. In addition to this statement, the FONSI must include, summarize, or attach and incorporate by reference, the environmental assessment.
37b. What are the criteria for deciding whether a FONSI should be made available for public review for 30 days before the agency's final determination whether to prepare an EIS?
A. Public review is necessary, for example, (a) if the proposal is a borderline case, i.e., when there is a reasonable argument for preparation of an EIS; (b) if it is an unusual case, a new kind of action, or a precedent setting case such as a first intrusion of even a minor development into a pristine area; (c) when there is either scientific or public controversy over the proposal; or (d) when it involves a proposal which is or is closely similar to one which normally requires preparation of an EIS. Sections 1501.4(e)(2), 1508.27. Agencies also must allow a period of public review of the FONSI if the proposed action would be located in a floodplain or wetland. E.O. 11988, Sec. 2(a)(4); E.O. 11990, Sec. 2(b).
38. Public Availability of EAs v. FONSIs. Must (EAs) and FONSIs be made public? If so, how should this be done?
A. Yes, they must be available to the public. Section 1506.6 requires agencies to involve the public in implementing their NEPA procedures, and this includes public involvement in the preparation of EAs and FONSIs. These are public "environmental documents" under Section 1506.6(b), and, therefore, agencies must give public notice of their availability. A combination of methods may be used to give notice, and the methods should be tailored to the needs of particular cases. Thus, a Federal Register notice of availability of the documents, coupled with notices in national publications and mailed to interested national groups might be appropriate for proposals that are national in scope. Local newspaper notices may be more appropriate for regional or site-specific proposals.
The objective, however, is to notify all interested or affected parties. If this is not being achieved, then the methods should be reevaluated and changed. Repeated failure to reach the interested or affected public would be interpreted as a violation of the regulations.
39. Mitigation Measures Imposed in EAs and FONSIs. Can an EA and FONSI be used to impose enforceable mitigation measures, monitoring programs, or other requirements, even though there is no requirement in the regulations in such cases for a formal Record of Decision?
A. Yes. In cases where an environmental assessment is the appropriate environmental document, there still may be mitigation measures or alternatives that would be desirable to consider and adopt even though the impacts of the proposal will not be "significant." In such cases, the EA should include a discussion of these measures or alternatives to "assist [46 FR 18038] agency planning and decisionmaking" and to "aid an agency's compliance with [NEPA] when no environmental impact statement is necessary." Section 1501.3(b), 1508.9(a)(2). The appropriate mitigation measures can be imposed as enforceable permit conditions, or adopted as part of the agency final decision in the same manner mitigation measures are adopted in the formal Record of Decision that is required in EIS cases.