Posted On: 04/01/2013 1:18:57 PM
Post# of 17862

Awaiting an update on the progress of building the ar-120 which can be checked out on http://www.hollundindustrial.com/ or tigerlynk.com or checkout the prototype used in the tucurui reservoir on YouTube. http://m.youtube.com/watch?v=c7Dso2g1jUk At about the 5 min. 10 second mark. Himr

