Posted On: 07/05/2012 12:02:15 PM
Post# of 8059
apparently keeping top of .5-1mm pile clear of trommel-can see why they got a customized 47 foot I believe discharge conveyor to assist w the huge piles they would have from processing the 200 k tons of 0-1mm "waste" product-which will drastically lower CWRN's cost of producing ore.
(0)
(0)
Scroll down for more posts ▼