Posted On: 07/05/2012 11:51:11 AM
Post# of 8054
Looks like trommel is being loaded from the 0-1mm pile that had been awaiting trommel and trommel is separating out the .5-1mm iron chips for sinter feed as previously reported by at least the last 2 PR's and publicly posted emails.
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)