Investors Hangout Stock Message Boards Logo
  • Home
  • Mailbox
  • Boards
  • Favorites
  • Whats Hot!
  • Login - Join Now!
Global Battery Metals Ltd. REZZ
(Total Views: 359)
Posted On: 07/18/2023 11:26:14 AM
Post# of 394
Avatar
Posted By: solartech
Piedmont Lithium (PLL.NASDAQ) ........................................



Piedmont Lithium (PLL.NASDAQ) Carolina Lithium project, located in Gaston County, North Carolina

https://piedmontlithium.com/projects/carolina-lithium/



Assays


25.22m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 5.40m @ 1.46% Li2O, 2.65m @ 1.24% Li2O and 2.00m @ 1.43% Li2O in Hole 17-BD-73

21.92m of cumulative thickness of mineralization across 5 pegmatites which includes high grade intercepts of 8.86m @ 1.72% Li2O, and 8.04m @ 1.02% Li2O in Hole 17-BD-80

18.66m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 6.27m @ 1.39% Li2O, 4.21m @ 1.83% Li2O, 2.26m @1.52% Li2O and 1.68m @ 1.83% Li2O in Hole 17-BD-64

18.64m of cumulative thickness of mineralization across 6 pegmatites which includes high grade intercepts of 6.66m @ 1.59% Li2O and 2.68m @ 1.58% Li2O in Hole 17-BD-75

14.08m of cumulative thickness of mineralization across 5 pegmatites which includes a high grade intercepts of 5.03m @ 1.98% Li2O and 2.04m @ 1.52% Li2O n Hole 17-BD-70

12.97m of cumulative thickness of mineralization across 2 pegmatites which includes a high grade intercept of 10.36m @ 1.53% Li2O in Hole 17-BD-72

24.38m of cumulative thickness of mineralization across 3 pegmatites which includes high grade intercepts of 18.04m @ 1.01% Li2O and 1.99m @ 1.28% Li2O in Hole 17-BD-87

23.64m of cumulative thickness of mineralization across 5 pegmatites which includes high grade intercepts of 11.60m @ 1.29% Li2O, and 5.97m @ 1.14% Li2O in Hole 17-BD-77

22.82m of cumulative thickness of mineralization across 4 pegmatites which includes high grade intercepts of 9.74m @ 1.31% Li2O and 5.73m @ 1.36% Li2O in Hole 17-BD-98

21.86m of cumulative thickness of mineralization across 4 pegmatites which includes high grade intercepts of 13.95m @ 1.34% Li2O and 2.93m @ 1.41% Li2O in Hole 17-BD-95

15.69m of cumulative thickness of mineralization across 3 pegmatites which includes high grade intercepts of 11.09m @ 1.27% Li2O and 3.41m @ 1.20% Li2O in Hole 17-BD-90

12.51m of cumulative thickness of mineralization across 2 pegmatites which includes a high grade intercept of 10.55m @ 1.46% Li2O in Hole 17-BD-102

28.5m of cumulative thickness of mineralization (non-continuous) across 7 pegmatites which includes high grade intercepts of 6.2m @ 1.21% Li2O and1.4m @ 1.50 Li2O in Hole 18-BD-166

19.1mof cumulative thickness of mineralization (non-continuous) across 2 dikes which includes high grade intercepts of 8.3m @ 1.66%Li2O and 10.9m @ 1.05% Li2O in Hole 18-BD-174

20.9m of cumulative thickness of mineralization (non-continuous) across 3 pegmatites which includes high grade intercepts of 4.6m @ 1.44% Li2O and3.0m @ 1.35 Li2O in Hole 18-BD-176

18.4m of cumulative thickness of mineralization (non-continuous) across 7 pegmatites which includes high grade intercepts of 7.7m @ 1.23% Li2O and1.7m @ 1.52 Li2O in Hole 18-BD-177

24.0m of cumulative thickness of mineralization (non-continuous) across 6 pegmatites which includes high grade intercepts of 11.7m @ 1.23% Li2O and2.6m @ 1.45 Li2O in Hole 18-BD-180

21.3m of cumulative thickness of mineralization (non-continuous) across 3 pegmatites which includes high grade intercepts of 8.9m @ 1.36% Li2O and6.2m @ 1.34 Li2O in Hole 18-BD-194

17.7m of cumulative thickness of mineralization (non-continuous) across 4 pegmatites which includes high grade intercepts of 3.3m @ 2.38% Li2O and9.4m @ 1.65 Li2O in Hole 18-BD-204

21.8m of cumulative thickness of mineralization (non-continuous) across 5 pegmatites which includes high grade intercepts of 8.0m @ 1.62% Li2O and2.6m @ 1.88% Li2O in Hole 18-BD-208



47% increase in Piedmont Project-wide Mineral Resource estimate to 27.9 Mt @ 1.11% Li2O

55% increase in Mineral Resource estimate on Core property to 25.1 Mt @ 1.09% Li2O

74% of the Core property resource is within 100m of surface and 97% is within 150m of surface

100% of the lithium resource is attributed to spodumene mineralization

Core property Resource is based on 326 diamond coreholes totalling over 51,000 meters

9,450 meters of drilling remain in Phase 4 drill campaign with numerous highly prospective targets



PIEDMONT RAISES A$70 MILLION TO DEVELOP AMERICAN LITHIUM PROJECT

https://piedmontlithium.com/piedmont-raises-a...m-project/



































(0)
(0)









  • New Post - Investors HangoutNew Post

  • Public Reply - Investors HangoutPublic Reply

  • Private Reply - Investors HangoutPrivate Reply

  • Board - Investors HangoutBoard

  • More - Investors HangoutMore

  • Keep Post - Investors HangoutKeep Post
  • Report Post - Investors HangoutReport Post
  • Home - Investors HangoutHome
  • Mailbox - Investors HangoutMailbox
  • Boards - Investors HangoutBoards
  • Favorites - Investors HangoutFavorites
  • Whats Hot! - Investors HangoutWhats Hot!
  • Settings - Investors HangoutSettings
  • Login - Investors HangoutLogin
  • Live Site - Investors HangoutLive Site