(Total Views: 163)
Posted On: 04/26/2022 5:34:48 PM
Post# of 13818

Re: Wallstreet1234 #1256
But again
In RI--DEM FINAL REVIEW it was enough to send a "letter of Intent"
The facility received a "letter of Intent" based on passing all the testing protocols which the tester (RI-DEM) informed them was required.
Looking forward to what size punitive damage SNPW WILL receive from the State of Rhode Island for changing the rules illegally after the fact.
In RI--DEM FINAL REVIEW it was enough to send a "letter of Intent"
Quote:
The proposal did not include adequate details about testing protocols
The facility received a "letter of Intent" based on passing all the testing protocols which the tester (RI-DEM) informed them was required.
Looking forward to what size punitive damage SNPW WILL receive from the State of Rhode Island for changing the rules illegally after the fact.

