(Total Views: 120)
Posted On: 03/08/2022 2:06:26 PM
Post# of 40420

$AGYP Allied has completed work on Green Lease Well M-1 and the well is producing as designed. The work-over rig has moved to Well X-3.
https://twitter.com/AlliedEnergyCo1/status/14...2278577159
https://twitter.com/AlliedEnergyCo1/status/14...2278577159

