(Total Views: 266)
Posted On: 03/08/2022 2:06:21 PM
Post# of 104083
$AGYP Allied has completed work on Green Lease Well M-1 and the well is producing as designed. The work-over rig has moved to Well X-3.
https://twitter.com/AlliedEnergyCo1/status/14...2278577159
https://twitter.com/AlliedEnergyCo1/status/14...2278577159
(0)
(0)
Scroll down for more posts ▼