(Total Views: 161)
Posted On: 12/08/2021 9:49:50 AM
Post# of 27066

$AGYP progress update on oil well drilling >>
$AGYP , Prometheus Well 1H being prepared this past weekend for operations. The Well in now online and the water is being pumped off to pull in the oil cut.
https://twitter.com/AlliedEnergyCo1/status/14...1516468226
$AGYP , Prometheus Well 1H being prepared this past weekend for operations. The Well in now online and the water is being pumped off to pull in the oil cut.
https://twitter.com/AlliedEnergyCo1/status/14...1516468226


