Posted On: 02/23/2013 5:54:37 PM
Post# of 17862

Awaiting an update on the progress of building the ar-120 which can be checked out on http://www.hollundindustrial.com/ or tigerlynk.com or checkout the prototype used in the tucurui reservoir on YouTube. http://m.youtube.com/watch?v=c7Dso2g1jUk At about the 5 min. 10 second mark.
Himr
Himr

