(Total Views: 568)
Posted On: 08/31/2021 1:22:25 AM
Post# of 72444

Avg CRO timeline:
Data used for CRO time lines is from publically available information advertised by competitors as well as industry standards according to the 2017 Tufts CSDD industry report. CRO timelines will vary.
LPLV to datalock = 36 days
Top Line Results = 3-5 days
TLF draft = 5 days
Additionally IMO for maximum benefit I think it is reasonable for Leo to release information the 2nd day after Labor Day.
IMO it’s coming soon and worth the waiting.
Data used for CRO time lines is from publically available information advertised by competitors as well as industry standards according to the 2017 Tufts CSDD industry report. CRO timelines will vary.
LPLV to datalock = 36 days
Top Line Results = 3-5 days
TLF draft = 5 days
Additionally IMO for maximum benefit I think it is reasonable for Leo to release information the 2nd day after Labor Day.
IMO it’s coming soon and worth the waiting.


Ronald A Phillips
Scroll down for more posts ▼