(Total Views: 415)
Posted On: 04/05/2021 6:26:32 AM
Post# of 2062
(“Mexus” or the “Company) announced that on April 12th the company plans on blasting at its Santa Elena mine located near Caborca, MX. The blast will produce approximately 10,000 tons of mineralized material averaging 2.2 gpt Au. Mexus expects to be producing gold from this material within 30 days of the blast.
The company continues to speak to multiple mining companies concerning partnerships for all its properties. The company believes the time is right with the company controlling 24 claims on approximately 12,500 hectares. The claims are located in the Sonoran State of Mexico and reside near other producing mines. The Santa Elena project is operational with all the necessary permits and equipment to crush, mine, and leach an initial 2500 tons a day of mineralized material. The company’s long-term goal is to mine 10,000 tons a day. The Mabel project, with only 5% of the concession drilled, has an estimated resource of approximately 45,000 oz. of Au near surface with little over burden. The Ures project gold assays show .5 to 16 gpt Au, 8 Brothers has shown up to 10 Kilos Ag per ton, and the Scorpio contains as high as 9% copper. Geologists from a neighboring mine recently visited Mexus’ Santa Elena project. The visiting geologist believe the minerals and multiple structures resemble those at the nearby La Herradura mine. Mexus feels the time is right to consider all qualified offers from exploration drilling companies to production investment companies allowing Mexus to expand to its fullest potential and offer the biggest return for its shareholders.
Lock him and his infantile partner in crime up. The incompetence, year after year of promises. Well, I guess we drank the Kool-Aid blinded with greed.
The company continues to speak to multiple mining companies concerning partnerships for all its properties. The company believes the time is right with the company controlling 24 claims on approximately 12,500 hectares. The claims are located in the Sonoran State of Mexico and reside near other producing mines. The Santa Elena project is operational with all the necessary permits and equipment to crush, mine, and leach an initial 2500 tons a day of mineralized material. The company’s long-term goal is to mine 10,000 tons a day. The Mabel project, with only 5% of the concession drilled, has an estimated resource of approximately 45,000 oz. of Au near surface with little over burden. The Ures project gold assays show .5 to 16 gpt Au, 8 Brothers has shown up to 10 Kilos Ag per ton, and the Scorpio contains as high as 9% copper. Geologists from a neighboring mine recently visited Mexus’ Santa Elena project. The visiting geologist believe the minerals and multiple structures resemble those at the nearby La Herradura mine. Mexus feels the time is right to consider all qualified offers from exploration drilling companies to production investment companies allowing Mexus to expand to its fullest potential and offer the biggest return for its shareholders.
Lock him and his infantile partner in crime up. The incompetence, year after year of promises. Well, I guess we drank the Kool-Aid blinded with greed.
(0)
(0)
Scroll down for more posts ▼