(Total Views: 769)
Posted On: 12/15/2020 5:33:28 PM
Post# of 151830
Realistic Expectation for CD12 P3 Top Line Data Release
After reaching day 28 there is still a few steps required before there will be a PR of the results. My guesstimate without any special considerations for work previously done with DSMC the "best case" for this to complete in a trial of this size would be early Feb and could be as late as mid-Feb.
Data has to be uploaded by participating hospitals
Data is un-blinded
Data is cleaned and analyzed by statisticians
TLD report is drafted and reviewed
TLD is released
After reaching day 28 there is still a few steps required before there will be a PR of the results. My guesstimate without any special considerations for work previously done with DSMC the "best case" for this to complete in a trial of this size would be early Feb and could be as late as mid-Feb.
Data has to be uploaded by participating hospitals
Data is un-blinded
Data is cleaned and analyzed by statisticians
TLD report is drafted and reviewed
TLD is released


Scroll down for more posts ▼