(Total Views: 535)
Posted On: 04/29/2020 9:26:50 PM
Post# of 148908
I believe that the first approval is the hardest, but I don't have any evidence to back that up. I do know that the manufacturing piece of each submission should be the same and that was part of our hold up with submitting BLA. So even if it doesn't get us a faster approval, the submission process should be faster
(0)
(0)
Scroll down for more posts ▼