(Total Views: 234)
Posted On: 03/10/2020 1:24:36 PM
Post# of 15
![](/m/assets/46931549/no_avatar_available_thumb.jpg)
$IMII Inception Mining, Inc. Announces 2020 Vat-Leach System
Inception is pleased to announce the completion of a new vat-leach system which can process 350 tons of material per 15 days, with an average recovery of 75%. The system was specifically built to handle sulfide and high-grade material (>7 grams-per-ton), due to its rapid turn-around and high recovery. This will allow Inception to utilize 100% of its gold-bearing resources and isolate its highest-grade material for rapid and highest-possible recovery of gold. Plans include expansion of system to accommodate an additional 1400 tons of material every 15 days. For a total month production rate of 3500 +- tons
Inception is pleased to announce the completion of a new vat-leach system which can process 350 tons of material per 15 days, with an average recovery of 75%. The system was specifically built to handle sulfide and high-grade material (>7 grams-per-ton), due to its rapid turn-around and high recovery. This will allow Inception to utilize 100% of its gold-bearing resources and isolate its highest-grade material for rapid and highest-possible recovery of gold. Plans include expansion of system to accommodate an additional 1400 tons of material every 15 days. For a total month production rate of 3500 +- tons
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)
Scroll down for more posts ▼