(Total Views: 606)
Posted On: 04/01/2019 12:41:21 PM
Post# of 22463
..contrast: 1 kg of QDs per 10 L of reactor each week :
Entire continuous-flow process can be automated and requires much less manual intervention. “From start to finish, it takes a minimum of 5 s to a maximum of 19 min, based on the QD material type
The numbers in literature for batch QD processes range from multiple hours to days or even weeks:
Currently, QMC has production capabilities to manufacture around 3 kg/h of QDs at its site in San Marcos
.....a point stated years ago
Entire continuous-flow process can be automated and requires much less manual intervention. “From start to finish, it takes a minimum of 5 s to a maximum of 19 min, based on the QD material type
The numbers in literature for batch QD processes range from multiple hours to days or even weeks:
Currently, QMC has production capabilities to manufacture around 3 kg/h of QDs at its site in San Marcos
.....a point stated years ago
(1)
(0)
Scroll down for more posts ▼