(Total Views: 444)
Posted On: 01/25/2019 9:04:24 AM
Post# of 75076
Re: biggestjimmy #51959
Yes. In the 8K, Co-Packer details great hearing this: "Productions
runs are to be scheduled on the 15th of each month, with a rolling 3 month production schedule to be provided with each monthly schedule."
here we go!
its coming.
runs are to be scheduled on the 15th of each month, with a rolling 3 month production schedule to be provided with each monthly schedule."
here we go!
its coming.
(11)
(0)
Scroll down for more posts ▼