(Total Views: 115)
Posted On: 07/23/2018 11:00:11 AM
Post# of 1635
We will see the first batch of OGGL's later this month!
The first Off Grid Grow Labs will roll off the production floor in late July and be field installed by August. IDVV has opened production facilities in Southern California and is ramping up production of both the Long OGGL (40 ft) and the Short OGGL (30Ft) systems; to help Manage this IDVV has engaged Voltage River and Konstruct Builders to oversee the build outs and ensure proper quality control of each OGGL.
https://finance.yahoo.com/news/international-...00144.html
$IDVV
The first Off Grid Grow Labs will roll off the production floor in late July and be field installed by August. IDVV has opened production facilities in Southern California and is ramping up production of both the Long OGGL (40 ft) and the Short OGGL (30Ft) systems; to help Manage this IDVV has engaged Voltage River and Konstruct Builders to oversee the build outs and ensure proper quality control of each OGGL.
https://finance.yahoo.com/news/international-...00144.html
$IDVV
(0)
(0)
Scroll down for more posts ▼