(Total Views: 265)
Posted On: 07/19/2017 2:29:51 PM
Post# of 72444

One more site has been added to P (34 total). The estimated completion date has been changed to December, which tells me enrollment should be 100% by August (study is 16 weeks long).
https://clinicaltrials.gov/ct2/show/NCT029493...amp;rank=4
https://clinicaltrials.gov/ct2/show/NCT029493...amp;rank=4



Scroll down for more posts ▼