(Total Views: 539)
Posted On: 03/24/2017 5:57:41 AM
Post# of 41413
Yes, of course.
1 plane during the final stages of the certification process (mini-evac and proving flights), the 2nd upon receiving certification (the company is required to have a back-up plane to begin its revenue generating scheduled flights), and then a plane added at least every 2 months for the next 12 months or so (a structured and controlled expansion).,
After that......to infinity and beyond.
1 plane during the final stages of the certification process (mini-evac and proving flights), the 2nd upon receiving certification (the company is required to have a back-up plane to begin its revenue generating scheduled flights), and then a plane added at least every 2 months for the next 12 months or so (a structured and controlled expansion).,
After that......to infinity and beyond.
(11)
(0)
Scroll down for more posts ▼