Posted On: 05/23/2016 12:58:22 PM
Post# of 337
Big Doings at the Buffalo Ranch!!
Head House and Nexus Greenhouse done and we should be hearing about a final inspection very soon
the Seasonal Greenhouses frames are up and the hard poly-bicarbonate siding panels are on site and ready for installation.
The wait is almost over
Head House and Nexus Greenhouse done and we should be hearing about a final inspection very soon
the Seasonal Greenhouses frames are up and the hard poly-bicarbonate siding panels are on site and ready for installation.
The wait is almost over
(1)
(0)
Scroll down for more posts ▼