Posted On: 05/13/2016 11:51:43 AM
Post# of 94

From 10Q filing
In February 2016, the modified AOT equipment was installed at Kinder Morgan’s facility. Pre-acceptance testing was performed in April 2016, culminating in more than 24 hours of continuous operations. In-field viscosity measurements and pipeline data collected during this test indicate the AOT equipment is operating as expected, resulting in reductions in viscosity and pipeline pressure equivalent to those measured under laboratory conditions. QS Energy and Kinder Morgan are now working to finalize installation and acceptance of the equipment under the lease.
This point is worthy of highlighting
"resulting in reductions in viscosity and pipeline pressure equivalent to those measured under laboratory conditions"
watch this space I would say
Doochuh
In February 2016, the modified AOT equipment was installed at Kinder Morgan’s facility. Pre-acceptance testing was performed in April 2016, culminating in more than 24 hours of continuous operations. In-field viscosity measurements and pipeline data collected during this test indicate the AOT equipment is operating as expected, resulting in reductions in viscosity and pipeline pressure equivalent to those measured under laboratory conditions. QS Energy and Kinder Morgan are now working to finalize installation and acceptance of the equipment under the lease.
This point is worthy of highlighting
"resulting in reductions in viscosity and pipeline pressure equivalent to those measured under laboratory conditions"
watch this space I would say
Doochuh


I'm a long term shareholder, I believe in the AOT