Posted On: 03/10/2016 6:13:46 PM
Post# of 41414

IMO re-read the post again it says:
In other words, finish certification with current aircraft, then get the other plane. Certification would be finished and can start operations with 747 while BLTA gets the 767 ready to go.
IMO
Quote:
Purchase of the aircraft is contingent on all, let me say again....... all FAA certifications and checks being passed.
In other words, finish certification with current aircraft, then get the other plane. Certification would be finished and can start operations with 747 while BLTA gets the 767 ready to go.
IMO


The fault-finder will find faults even in paradise. -Henry David Thoreau