Posted On: 01/30/2016 12:44:25 PM
Post# of 56323
I know it's been awhile but does anyone know if we meet the requirements for the distance between the entities stated below from the article?
"The ALC bylaw standards suggest a maximum 35 per cent lot coverage with a 150-metre setback from parks and schools and a building no higher than 15 metres.
Medical marijuana production facilities will need a 30 metre buffer from residential areas that are not within the agricultural land reserve and must keep the same distance away from watercourses.
Steppuhn says the city’s bylaw cannot exceed those standards although they are free to set a lower standard in some cases."
http://infotel.ca/newsitem/kelowna-readies-by...lw.twitter
JAX
"The ALC bylaw standards suggest a maximum 35 per cent lot coverage with a 150-metre setback from parks and schools and a building no higher than 15 metres.
Medical marijuana production facilities will need a 30 metre buffer from residential areas that are not within the agricultural land reserve and must keep the same distance away from watercourses.
Steppuhn says the city’s bylaw cannot exceed those standards although they are free to set a lower standard in some cases."
http://infotel.ca/newsitem/kelowna-readies-by...lw.twitter
JAX
(0)
(0)
Scroll down for more posts ▼