wooooooooooo hooooooooooooooo... stem wall forms removed and headhouse footings poured. you can see the stem wall to the greenhouse in the background in the shot with the truck and finishers pouring the footings on the head house
Looks like the greenhouse construction starts as soon as 1-17-2016. the cure test on the footings passed at 7 days and as soon as the stem wall cure tests passes inspection it is on. they are thinking the 17th. not slab for the greenhouse, apparently Dr J has requested using his special mixture of gravel and different mediums to maintain the moisture level to naturally combat mold and mildew. Dr J knows what he is doing here... no doubt
possibly the slab for the headhouse during next weeks 40° temps
Looks like the greenhouse construction starts as soon as 1-17-2016. the cure test on the footings passed at 7 days and as soon as the stem wall cure tests passes inspection it is on. they are thinking the 17th. not slab for the greenhouse, apparently Dr J has requested using his special mixture of gravel and different mediums to maintain the moisture level to naturally combat mold and mildew. Dr J knows what he is doing here... no doubt
possibly the slab for the headhouse during next weeks 40° temps
(0)
(0)
Scroll down for more posts ▼