Posted On: 11/24/2015 11:04:24 AM
Post# of 75077
IMO the water project with the Comanche Indian family will be an ongoing one. The way I read the PR is that eventually the water product will be 100% produced on the Indian reservation. In the short term IMO the water beverages will be produced at a off reservation bottling facility.
(0)
(0)
Scroll down for more posts ▼