Posted On: 06/25/2015 3:52:27 PM
Post# of 12259
Depends on what youre making .. if that is a 4 yard bucket on the excavator it is equal to about one ton of dirt material
when I was making aggregate road bed material my wash plant would process about 150 tons per 12 hour shift
when I was making aggregate road bed material my wash plant would process about 150 tons per 12 hour shift
(0)
(0)
No matter how stupid you feel, remember, Little Red Riding Hood couldn't figure out a talking wolf in drag wasn't her grandmother
Scroll down for more posts ▼