Posted On: 06/14/2015 10:49:56 PM
Post# of 403

in 2008 after the spaulding drilling co drilled through the dolerite approx 750 ft and up to the main driller the hunt #3 of the hunt energy moving the rig into position at the main discovery site BELLEVUE #1 in tasmania eegc pps had seen a high of 18-19 cents before the drill bit even turned.even though the a.s may be maxed out at 600 million ,iam not sure ,[5 year dark period due to lawsuit[ i believe with the right news we have a great potential here to move up from our .01 position now?i believe we should hit a number of trap plays if and when we drill on the descent to approx 8000ft or more?imo

