Posted On: 06/04/2015 10:48:24 AM
Post# of 43065
My thought is #4 and #5 will get installed in NF eventually.
OBG will control all aspects of the manufacturing, purchasing, assembly, installation and operations of the facilities. At some point I expect NF will be sold after it has become a viable commercial configuration.
PTOI essentially will become a very lean licensing organization between ECO, the marketing and sales organization, and OBG, everything else. There will be profits for everyone involved in solving an environmental issue by converting a waste product into a resource.
That is for the U S. and maybe Canada. Since it is a worldwide problem there may be some other partners that will need to be involved across the ponds.
Things do look "interesting".
OBG will control all aspects of the manufacturing, purchasing, assembly, installation and operations of the facilities. At some point I expect NF will be sold after it has become a viable commercial configuration.
PTOI essentially will become a very lean licensing organization between ECO, the marketing and sales organization, and OBG, everything else. There will be profits for everyone involved in solving an environmental issue by converting a waste product into a resource.
That is for the U S. and maybe Canada. Since it is a worldwide problem there may be some other partners that will need to be involved across the ponds.
Things do look "interesting".
(0)
(0)
Scroll down for more posts ▼