Posted On: 02/13/2015 11:18:25 AM
Post# of 43065

Well, this might be a boring stretch for a while.
I'm sure both the believers and the skeptics expect a glowing press release in about two and half months saying the pilot run exceeded the company's most optimistic expectations, that EcoNavigation is doing handsprings at the amazing results and that everyone's mouths are watering in anticipation of selling processors to clients. The difference is that the believers will believe the press release is all true and the skeptics will believe the press release is just continuing the fabricated story line--so basically everything will continue to be exactly the same as it's been for the past six years.
At any rate, PTOI is going to need to put out a new carrot to take the place of the pilot run carrot at the pilot run carrot's expiration date in early May.
I'm sure both the believers and the skeptics expect a glowing press release in about two and half months saying the pilot run exceeded the company's most optimistic expectations, that EcoNavigation is doing handsprings at the amazing results and that everyone's mouths are watering in anticipation of selling processors to clients. The difference is that the believers will believe the press release is all true and the skeptics will believe the press release is just continuing the fabricated story line--so basically everything will continue to be exactly the same as it's been for the past six years.
At any rate, PTOI is going to need to put out a new carrot to take the place of the pilot run carrot at the pilot run carrot's expiration date in early May.


Yes, I understand your penny stock also is the real deal, created with the inventiveness of Edison and destined to be the next Microsoft. Yes, I understand that the delays are also only because your company is making their product and/or technology even more revolutionary.
Scroll down for more posts ▼