Posted On: 01/22/2015 9:29:12 AM
Post# of 18857
$MVTG CEO has confirmed that MVTG entered phase IIII of the 5 stage R&D deal entered into with Allstom GE where by MVTG is being paid by Alstom GE to do R&D to produce a special version of the patented MVTG ERC reactor that makes high value chemicals out of CO2 waste gases from industry.
This means that the phase two was a huge success!!
http://mantraenergy.com/wp-content/uploads/RB...2015-1.pdf
This means that the phase two was a huge success!!
http://mantraenergy.com/wp-content/uploads/RB...2015-1.pdf
(0)
(0)
Scroll down for more posts ▼