Posted On: 01/12/2015 10:55:43 PM
Post# of 43064
Nah, the kilns and towers are still down the street at the fab plant. Safe bet that the Falls will be the pilot using 3.
I been down this road with PTOI like the rest, everything takes longer than expected. I'll stick to Sept.
I been down this road with PTOI like the rest, everything takes longer than expected. I'll stick to Sept.
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)