Posted On: 01/12/2015 4:29:28 PM
Post# of 43064
![](/m/assets/46931549/no_avatar_available_thumb.jpg)
I anticipate when the pilot project begins at the Niagara plant it will show the deal is legit. There may be no costs or even profits during the testing - run their feedstock and sell the fuel.
I also expect the engineering firm does not want their name revealed at this time so they don't have to deal with hundreds of basher calls.
I also expect the engineering firm does not want their name revealed at this time so they don't have to deal with hundreds of basher calls.
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)