Posted On: 11/04/2014 11:24:57 PM
Post# of 2009

Hey Spear,
We are waiting on proof of product from the supplier that the jet fuel arrived at Rotterdam per the post on Xun Forum here:
"JV002 Status:
As of October 24, 2014, JV002 is waiting for Proof of Product (POP) from the Supplier that the jet fuel has arrived at Rotterdam and unloaded in a jet fuel storage tank. The following documents are required:
1. Tank Storage Receipt (TSR);
2. Authorization To Sell (ATS);
3. Dip Test Authorization (DTA); and
4. Fresh SGS report, not less than 48 hours.
Upon receipt of the above documents, JV002's banker will release the Irrevocable Revolving Documentary Letter of Credit (IRDLC) guaranteeing payment for the first (trial) shipment and subsequent deliveries of Jet Fuel."
link here: http://forum.xunenergy.com/default.aspx?g=pos...3#post6022
We are waiting on proof of product from the supplier that the jet fuel arrived at Rotterdam per the post on Xun Forum here:
"JV002 Status:
As of October 24, 2014, JV002 is waiting for Proof of Product (POP) from the Supplier that the jet fuel has arrived at Rotterdam and unloaded in a jet fuel storage tank. The following documents are required:
1. Tank Storage Receipt (TSR);
2. Authorization To Sell (ATS);
3. Dip Test Authorization (DTA); and
4. Fresh SGS report, not less than 48 hours.
Upon receipt of the above documents, JV002's banker will release the Irrevocable Revolving Documentary Letter of Credit (IRDLC) guaranteeing payment for the first (trial) shipment and subsequent deliveries of Jet Fuel."
link here: http://forum.xunenergy.com/default.aspx?g=pos...3#post6022


The fault-finder will find faults even in paradise. -Henry David Thoreau