Posted On: 10/16/2014 12:32:18 PM
Post# of 56323
![](/m/assets/46931549/no_avatar_available_thumb.jpg)
Re: bushmantrader #39369
Actually, article I. Inspector's Conclusion stated that
The only other deficiency I saw was regarding the 2 vents in the vault needed to be covered with a steel mesh but the conclusions clearly stated the only reason a re-instaction MIGHT be needed was to check the growing pods.
FITX
Quote:
the applicant will be ready and able to meet the requirements of the MMPR provided the deficiencies noted furring the inspection debrief meeting are addressed. A re-inspection may be required to assess the security measures for the full scale growing pods once construction is complete.
The only other deficiency I saw was regarding the 2 vents in the vault needed to be covered with a steel mesh but the conclusions clearly stated the only reason a re-instaction MIGHT be needed was to check the growing pods.
FITX
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)