Posted On: 08/12/2014 3:43:09 AM
Post# of 8059
madflight said google earth updated for ese port to 1-24-14 -see above pic of eit, api and cruise terminals
when ore is trucked they make room for it- port is planning on new bulk mineral terminal N of city
lots of room for ore at api if cordon off the material as grajekk i believe has pointed out- and port brochure medi posted says they can handle 240m long panamax there now -
problem is customs is at entrance to eit so IF could solve that could also ship from api w stated depth of 13.05m -
eit is draft of 14.5 m -lia loaded w 68069 tons May 2013 was 13.7 m draft -which i think is why they didnt load more -same reason they took some ore off loreta aug 2011 - 36002 tons load- due to china river draft limitations
ore or scrap there in pic is at eit 1 -not enough draft-ca 11m (out from dock)- for our purposes,
big ship is eit 2 gantry cranes -where cwrn ships from - eit 3 is the narrow sub dock to south of terminal w draft of only 10m
cruise term draft only 9m
api 2 is the narrow entrance to eit where customs is-only room for short ships
E of api is ''fishing'' terminal followed by drydock repair
(0)
(0)
Scroll down for more posts ▼