Posted On: 08/04/2014 2:48:45 PM
Post# of 56323
You know if you read the PR, they said they are prepared to operationally grow after some dry runs. It didn't say they were prepared for inspection. My simple thoughts would be we have been inspected. We might be waiting on the issuance of the license at this point. No mention of waiting for inspection. JMO
(0)
(0)
Scroll down for more posts ▼