Posted On: 06/29/2014 9:32:14 PM
Post# of 8059
![Avatar](https://investorshangout.com/images/ProfileImages/752_guyam_island-dsc00783.jpg)
![10492485_689922294434093_194963608537131845_n.jpg](https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-xpf1/t1.0-9/q74/s720x720/10492485_689922294434093_194963608537131845_n.jpg)
I will attribute if wanted but in past this source (nobody assoc w the co) has wished to remain anon re such a pic source
this is a june 20 pic of the API cabotage (foreground where the ship w big pipes is- APi2 would only be used by very small ships )
the EIT1 office berth where ore or scrap metal (cant tell at a distance) is to right of the large blue crane
and EIT2 14.5M gantry crane berth CWRN has used to date
lot more room at API 1 for ore but 200m length and 13.05m draft limitations (they stopped loading ILIA at 13.7 m w only ca 69000 tons on a ship that could carry possibly 75000 or more tons (but only ca 52500 tons thru canal due to Gatun lake draft limitations)
![](/m/images/thumb-up.png)
![](/m/images/thumb-down.png)
Scroll down for more posts ▼