Posted On: 04/20/2014 11:46:43 PM
Post# of 56323
K-ro17, that is total nonsense. The poster on the other board is a basher. The building we are going to use is Building 1 which has solar panels on the roof as well as electricity from an outside source.
Building 2 isn't yet completed but looks like it will be very soon probably within the next two weeks. It too will have electricity.
SIO
Building 2 isn't yet completed but looks like it will be very soon probably within the next two weeks. It too will have electricity.
SIO
(0)
(0)
Scroll down for more posts ▼