Posted On: 04/20/2014 1:25:59 AM
Post# of 8059
Re: mediscience #6285
The existing port facilities in Ensenada and
the existing highway infrastructure between
the mines and the port will not permit much
expansion beyond about
150,000t
per Month.
Therefore, over the next
3
-
5 years,
we plan to
construct a ship loading facility close to the
mines which will allow shipments up to 5.0
Million Tons annually
aboard
Capesize
Bulk
Carriers
the existing highway infrastructure between
the mines and the port will not permit much
expansion beyond about
150,000t
per Month.
Therefore, over the next
3
-
5 years,
we plan to
construct a ship loading facility close to the
mines which will allow shipments up to 5.0
Million Tons annually
aboard
Capesize
Bulk
Carriers
(0)
(0)
Scroll down for more posts ▼