Posted On: 03/31/2014 8:14:15 AM
Post# of 1352
RE: " Projects that were put on hold are now being dusted off and moving forward, he said." …With Cirque looking to hire a Mechanical Engineer in Midland, I've been wondering for some time if they were "dusting off" the Dow Corning Project:
" Cirque Energy, LLC fully developed and sold the project in 2011 to VC Energy for the construction and operation of the MPS. The project received all necessary permits for construction in 2012. The project was jointly cancelled by VC Energy and Dow Corning in 2012 due to market uncertainties."
http://www.cirque-energy.com/projects/mps.html
http://www.cirque-energy.com/images/Mechanica..._14001.pdf
" Cirque Energy, LLC fully developed and sold the project in 2011 to VC Energy for the construction and operation of the MPS. The project received all necessary permits for construction in 2012. The project was jointly cancelled by VC Energy and Dow Corning in 2012 due to market uncertainties."
http://www.cirque-energy.com/projects/mps.html
http://www.cirque-energy.com/images/Mechanica..._14001.pdf
(0)
(0)
Scroll down for more posts ▼