Posted On: 03/28/2014 9:54:17 PM
Post# of 56323
Jeffliner being u have me blocked i cant respind to u but the base of the vault is the concrete floor. So if they have te floor poured or a section of it for where the vault will e place then the next thjng is to have the vault delivered an assembled.. The vault should come in 8 foot tall sections maybe 10 foot ive done a couple banks in the pas years that use this pre fabricated vault system
(0)
(0)
Scroll down for more posts ▼