Okay, here's a "bash" and I'll take my lumps, but I believe there are building contractors reading this board so, please, lend some insight.
After going over the pictures of the existing building looking for evidence as to how far along we are in construction I don't see any evidence of three things I would think are must haves for this operation. 1. a backup generator for power outages, 2. a step down transformer, and 3. any evidence of HVAC/fresh air intake.
The generator and transformer can be set in one morning, but how/where is the air intakes and HVAC units?
Is it possible to have all this within the building?
After going over the pictures of the existing building looking for evidence as to how far along we are in construction I don't see any evidence of three things I would think are must haves for this operation. 1. a backup generator for power outages, 2. a step down transformer, and 3. any evidence of HVAC/fresh air intake.
The generator and transformer can be set in one morning, but how/where is the air intakes and HVAC units?
Is it possible to have all this within the building?