Posted On: 01/09/2014 12:13:30 PM
Post# of 375
$SGLB $AMAVF $XONE $VJET $DDD $SSYS $GGRGF SGLB staying strong as investors learn of the dire need for closed-loop control. GE Additive Manufacturing executives Prabhjot Singh and Greg Morris need to start production for their LEAP engines now. GE has a backlog of $114 Billion and Airbus A320 takes flight in 2016.
GE backlog: http://www.geaviation.com/press/other/other_20131119.html
Airbus A320: http://www.geaviation.com/press/cfm56/leap-x/...30311.html
There is no time to waste for testing, evaluation, certification, and FAA approval if 3D printers are not efficient.
http://jjsigmalabsblog.blogspot.com/2014/01/t...g-and.html
GE backlog: http://www.geaviation.com/press/other/other_20131119.html
Airbus A320: http://www.geaviation.com/press/cfm56/leap-x/...30311.html
There is no time to waste for testing, evaluation, certification, and FAA approval if 3D printers are not efficient.
http://jjsigmalabsblog.blogspot.com/2014/01/t...g-and.html
(0)
(0)
Scroll down for more posts ▼