Posted On: 09/06/2012 4:49:14 PM
Post# of 8059
Re: iggyman555 #2438
I am wondering if the ore sitting at the port has been protected from the rain. At a certain point if not already the moisture content will be a problem as it must be within the TML (Transportable Moisture Limit) I guess at the mine they can process it prior to shipping. I am just concered as it may not be till next year until further ships sail with ore from the mine hope the load at the port goes soon as it should due to it being paid for already.
(0)
(0)
Scroll down for more posts ▼